one night stand
#1
hi all i got this sum time a go it needed a new magnet well i replaced the magnet all it needed was the rod on the top i made two new rods i coped the length of a clock stand that i got of john the rod is stainless steel 10mm in di i drilled one of the rods and taped m8 and fitted a m8 cap head with sum bearing fit i cut the cap head dawn to size and scrud it on to the Base the next thing to mack is sum clamps out of stainless steel right pics


Attached Files Thumbnail(s)
                   
krv3000, proud to be a member of MetalworkingFun Forum since Feb 2012.
Reply
Thanks given by:
#2
Bob,
Whot, ............. you drilled and tapped it, then screwed in a ready made screw - that's cheating, Rotfl I supose next you will be using DRO's Slaphead Slaphead Slaphead Rotfl And then CNC - what is the World coming to RotflRotflRotfl
Smiley-eatdrink004
DaveH
Reply
Thanks given by:
#3
Again nice work!
sasquatch, proud to be a member of MetalworkingFun since Jul 2012.
Reply
Thanks given by:
#4
what you want to bet he used that everlasting drill he just rebuiltBig GrinBig Grin, Smiley-signs107.
dallen, proud to be a member of MetalworkingFun Forum since Apr 2012.

If life seems normal, your not going fast enough! Tongue
Reply
Thanks given by:




Users browsing this thread: 2 Guest(s)