one night stand - Printable Version +- MetalworkingFun Forum (http://www.metalworkingfun.com) +-- Forum: Machining (http://www.metalworkingfun.com/forum-5.html) +--- Forum: Projects (http://www.metalworkingfun.com/forum-7.html) +--- Thread: one night stand (/thread-960.html) |
one night stand - krv3000 - 11-03-2012 hi all i got this sum time a go it needed a new magnet well i replaced the magnet all it needed was the rod on the top i made two new rods i coped the length of a clock stand that i got of john the rod is stainless steel 10mm in di i drilled one of the rods and taped m8 and fitted a m8 cap head with sum bearing fit i cut the cap head dawn to size and scrud it on to the Base the next thing to mack is sum clamps out of stainless steel right pics RE: one night stand - DaveH - 11-04-2012 Bob, Whot, ............. you drilled and tapped it, then screwed in a ready made screw - that's cheating, I supose next you will be using DRO's And then CNC - what is the World coming to DaveH RE: one night stand - sasquatch - 11-04-2012 Again nice work! RE: one night stand - dallen - 11-05-2012 what you want to bet he used that everlasting drill he just rebuilt, . |