Posts: 3,003
Threads: 51
Joined: Apr 2012
Location: Ontario
The following 1 user Likes f350ca's post:
EdK (05-06-2015)
Thats weld porn Dave
Free advice is worth exactly what you payed for it.
Greg
Posts: 4,683
Threads: 93
Joined: Feb 2012
Location: Perth, Australia
Looking good Dave.
Did you spot/tack weld it first or lay the bead down? The reason I ask is that if you assemble it this way you are less likely to have it warp on you and it is much easier to rectify a mistake.
Hunting American dentists since 2015.
Posts: 4,513
Threads: 139
Joined: Feb 2012
Location: Kempton Park. South Africa
I tack welded first - one tack until all 4 sides were connected -then I went around the same sides and put another tack. I check for squareness after each tack.
Turned it over and put two tacks on each joint. Checking for squareness all the time.
Turned it over again laid a bead on each joint. Turned it over and laid the beads as in the photo.
It took along time nearly the whole day, although some time was spent setting up the band saw to cut the miters.
DaveH
Posts: 4,683
Threads: 93
Joined: Feb 2012
Location: Perth, Australia
That is the way to do it Dave. You are correct that it does take longer but the time spent there is saved by not having to try and resurrect a steel pretzel at the end! However, you can also now see why I don't favour the miter joints.
Hunting American dentists since 2015.
Posts: 8,898
Threads: 320
Joined: Feb 2012
Location: Arizona/Minnesota
Dave,
What welder did you use? MIG?
Ed
Posts: 4,513
Threads: 139
Joined: Feb 2012
Location: Kempton Park. South Africa
Hi Ed,
No MIG, I use stick welding
DaveH