32x40 H Gas Engine
#81
Brian, that material looks like copper? Is that suitable for a bearing?
Busy Bee 12-36 lathe, Busy Bee Mill drill, Busy Bee 4x6 bandsaw, Homemade 9x17 bandsaw, Ad infinitum.
Reply
Thanks given by:
#82
Hi Steve

Thanks for the heads up, it was ordered and delivered as PB 102 phosphor bronze,  it looks red but is very hard. not sticky to cut like copper.

Here are the photo's of the finished article .

   

   

   



Brian Smiley-dancenana
Brian, proud to be a member of MetalworkingFun since Sep 2012.
http://briansworkshop.weebly.com Welcome
Reply
Thanks given by:
#83
Nice job Brian Thumbsup  really is coming along fast

Smiley-eatdrink004 
DaveH
Reply
Thanks given by:
#84
Trying to get some time in on the project because I am going to Scotland for Christmas and new year to see the kids 
Brian Smiley-dancenana
Brian, proud to be a member of MetalworkingFun since Sep 2012.
http://briansworkshop.weebly.com Welcome
Reply
Thanks given by:
#85
To lube the big end a drip feed oiler will supply oil to the outside of the crank flange centrifugal force will spin it out into the collector ring and then pass it into the bearing,

Hopefully good lube with less mess.

   

   




Brian. Smiley-dancenana
Brian, proud to be a member of MetalworkingFun since Sep 2012.
http://briansworkshop.weebly.com Welcome
Reply
Thanks given by:
#86
Fiddly jobs today,  balance the crank, and fit the pins to the connecting rod, Only the threads to retain the flywheels and the keyways to do and the crank can be assembled and pinned,

 Boy will that ever be a relief !!!!

   

Leaving for Scotland for the holidays to see the grand children. 6799

Brian Smiley-dancenana
Brian, proud to be a member of MetalworkingFun since Sep 2012.
http://briansworkshop.weebly.com Welcome
Reply
Thanks given by:
#87
Nice work Brian.

How are you planning to pin the crank? Axial dowel pins on the mating diameters?

Tom
[Image: TomsTechLogo-Profile.png]
Reply
Thanks given by:
#88
Yes Tom 4mm drill rod double shear on the mains and single shear on the big end. assembled with Loctite.
that will have to wait until I return.

Brian.
Brian, proud to be a member of MetalworkingFun since Sep 2012.
http://briansworkshop.weebly.com Welcome
Reply
Thanks given by:
#89
Hi All
 Back from windy Scotland  to a freezing cold Sicily, now that just ain't right.
however I returned with two 1/2 X 20 nuts for the flywheels so it's time to threads the crank ends.

   

Then cut the keyways for the flywheels

   


.jpg   P1012996.JPG (Size: 49.89 KB / Downloads: 86)

Not long until we have to assemble the crank Yikes

Brian  Smiley-dancenana
Brian, proud to be a member of MetalworkingFun since Sep 2012.
http://briansworkshop.weebly.com Welcome
Reply
Thanks given by:
#90
Today's the day.

First fit the pin. --then twiddle thumbs for 1 hr.

[attachment=9840]

Now add the web and bolt up hard to the centre -- twiddle.

[attachment=9840]

Add second web and bolt up. put to one side until tomorrow.

Wheew.  Brian. Smiley-dancenana


Attached Files Thumbnail(s)
   
Brian, proud to be a member of MetalworkingFun since Sep 2012.
http://briansworkshop.weebly.com Welcome
Reply
Thanks given by:




Users browsing this thread: 17 Guest(s)