11-03-2012, 07:06 PM
hi all i got this sum time a go it needed a new magnet well i replaced the magnet all it needed was the rod on the top i made two new rods i coped the length of a clock stand that i got of john the rod is stainless steel 10mm in di i drilled one of the rods and taped m8 and fitted a m8 cap head with sum bearing fit i cut the cap head dawn to size and scrud it on to the Base the next thing to mack is sum clamps out of stainless steel right pics
krv3000, proud to be a member of MetalworkingFun Forum since Feb 2012.