Posts: 8,854
Threads: 318
Joined: Feb 2012
Location: Arizona/Minnesota
Minor misunderstandings. Unfortunately, it's the nature of the beast, the internet that is. Let's just concentrate on the wonderful build thread Bill has started. We're all here to learn and enjoy exchanging information about metalworking.
Ed
Posts: 4,683
Threads: 93
Joined: Feb 2012
Location: Perth, Australia
Looking good so far Bill. Do you have a pic of what the end result will be, so we can see what you are building towards?
Hunting American dentists since 2015.
Hopefully it will be close to this Darren.
"Billy G"
Attached Files
Thumbnail(s)
Posts: 4,513
Threads: 139
Joined: Feb 2012
Location: Kempton Park. South Africa
Bill,
Wow, this is going to be one great build, really looking forward to it Bill.
Dave
Posts: 4,683
Threads: 93
Joined: Feb 2012
Location: Perth, Australia
I agree Dave! I'll be following this with interest Bill.
Hunting American dentists since 2015.
Posts: 8,854
Threads: 318
Joined: Feb 2012
Location: Arizona/Minnesota
Bill,
That's one serious project you're embarking on. Good luck and we'll all be watching this thread, I'm sure.
Ed
Thanx everyone. Sometimes a little encourgement helps to continue.
Next up was the Super Charger housing. Lots of boring here. It fits just ahead and is attached to the Gearbox.
"Billy G"
Attached Files
Thumbnail(s)
Posts: 1,459
Threads: 159
Joined: Feb 2012
Location: Northern England
Bill
That is a fine looking engine
You are making a great start
Keep the pictures coming
John
Thanx.
Before moving ahead I wanted to do the oil pump. This was a nasty little bugger to do.The pix shows the print and blanks. Also some special tooling had to be made. It is an adustable center arbor for the faceplate.
"Billy G"
Attached Files
Thumbnail(s)
Gear blanks had to be made.
"Billy G"
Attached Files
Thumbnail(s)