Posts: 8,891
Threads: 320
Joined: Feb 2012
Location: Arizona/Minnesota
Posts: 642
Threads: 14
Joined: Oct 2013
Location: East Sussex, UK
Short lives I expect with those rubber bands if you're running coolant
Andrew Mawson, proud to be a member of MetalworkingFun Forum since Oct 2013.
Posts: 438
Threads: 67
Joined: Sep 2012
Location: Central Mass.
(11-25-2015, 11:34 AM)awemawson Wrote: Short lives I expect with those rubber bands if you're running coolant
The coolant we have is outstanding, and all those issues went away when we switched over to it.
Now it's mostly the chips that will get to them.
The previous coolant we had though would eat through them in very short order.
We keep a big box of them at the ready though!!
Best Regards,
Russ
Check us out on Facebook and give us a "Like"
Crosby Machine Company, Inc
Posts: 438
Threads: 67
Joined: Sep 2012
Location: Central Mass.
Summer time at the shop in West Brookfield, Mass.
Being that it is Thanksgiving tomorrow...........it seems sooooooo far away right now!
Best Regards,
Russ
Check us out on Facebook and give us a "Like"
Crosby Machine Company, Inc
Posts: 8,891
Threads: 320
Joined: Feb 2012
Location: Arizona/Minnesota
The following 1 user Likes EdK's post:
wrustle (11-25-2015)
Our first measurable snow is supposed to arrive tomorrow so I'm not complaining. That's way later than average.
Ed
Posts: 2,629
Threads: 101
Joined: Dec 2014
Location: Michigan
The following 1 user Likes Vinny's post:
wrustle (11-25-2015)
He did say the pic was taken in the SUMMER Ed. :)
Posts: 8,891
Threads: 320
Joined: Feb 2012
Location: Arizona/Minnesota
The following 1 user Likes EdK's post:
wrustle (11-25-2015)
(11-25-2015, 04:49 PM)Vinny Wrote: He did say the pic was taken in the SUMMER Ed. :)
I need to quit taking quick peeks at posts and actually read them more thoroughly.
Ed
Posts: 2,344
Threads: 53
Joined: Feb 2012
Location: Spencer MA USA
I appreciate you sharing that with us Russ!
This shows how much you are thinking the jobs through for maximum efficiency. I can't tell you how many times I've seen shops "spinning the wheels" by plowing through material at high "cubic inches per minute" material removal rates, only to stand there deburring parts or loading 64 pieces on a tombstone while the spindle is idle.
Maximizing
productivity is all about balance, and that's what you are actively doing. It's going to keep your costs down for you and your customers, assuring repeat work. You are setting up Andrew and others for the future well, so you'll be able to just "consult" when you retire.
Posts: 716
Threads: 32
Joined: Apr 2012
Location: Washington, USA
That's the problem I had working those shops - too focused on the immediate, not the whole job. I failed at production; I'd rather do repairs. Carbide tooling just gets set aside, I don't even own a single insert.