08-13-2016, 09:17 PM
Still too humid to open the shop doors so I've been working inside. The log deck would have been a lot easier to build spread out, but we built it in the folded position. Had to get all the bunks square and level before welding so they'd hopefully open up properly.
Found a piece of 1 3/8 4 tpi acme rod, believe it was for levelling scaffolding. I made a 4 inch deep nut that was then cut in 3 for levelling the legs.
The log deck folded for transport. Had to make a double jointed hinge to get it to fold 180 degrees.
Now I need to get it outside to install the roller chains for moving the logs.
Found a piece of 1 3/8 4 tpi acme rod, believe it was for levelling scaffolding. I made a 4 inch deep nut that was then cut in 3 for levelling the legs.
The log deck folded for transport. Had to make a double jointed hinge to get it to fold 180 degrees.
Now I need to get it outside to install the roller chains for moving the logs.
Free advice is worth exactly what you payed for it.
Greg
Greg