04-02-2016, 07:19 PM
Once you get the shaper set up multiple keyways are pretty quick. Can probably cut one in under a minute. The first one I had the stroke set slow to see how it was going, took too big a bite and snapped the 1/4 cutter without even mowning.
These sprockets will drive the drag chains on top of the log bunks. Cut them on the plasma table. Ready for welding.
These are the bunks the logs will feed from. Number 60 roller chain on top of them will move the logs along. There will be folding extensions off to the side. Its starting to outgrow the shop though.
These sprockets will drive the drag chains on top of the log bunks. Cut them on the plasma table. Ready for welding.
These are the bunks the logs will feed from. Number 60 roller chain on top of them will move the logs along. There will be folding extensions off to the side. Its starting to outgrow the shop though.
Free advice is worth exactly what you payed for it.
Greg
Greg