Posts: 332
Threads: 10
Joined: Nov 2012
Location: East Yorkshire
The following 2 users Like hermetic's post:
EdK (09-17-2022), Vinny (09-17-2022)
Last weeks video, which I didn't seem to have posted properly?
A long video with a lot in it! I get down to the nitty gritty of some repairs on the SC box and selectors, quite a lot of lathecam on the covmac, but had to go to the colchester for knurling due to centre height! and get some paint on, Lots of polishing and washing goes on, and I realise the value of scotchbrite for polishing metals! I almost got 5 days in!
Phil, a wet week followed by a Friday scorcher in East Yorkshire!
Posts: 332
Threads: 10
Joined: Nov 2012
Location: East Yorkshire
The following 1 user Likes hermetic's post:
Vinny (09-17-2022)
A shorter vid this week which starts with gratuitous tumble dryer repairs, same dryer, different fault! cracked drum pivot (caused by stretch belt?) and then on to the Holbrook and a week of stripping, cleaning and repairing. One cannot fail to be impressed by the build quality of this machine. 92 years after its construction, and after quite a tough life, it is still in amazing condition!
Phil, in sunny but slightly autumnal East Yorkshire
Posts: 332
Threads: 10
Joined: Nov 2012
Location: East Yorkshire
The following 1 user Likes hermetic's post:
Vinny (09-24-2022)
A short week, but I have turned the corner and started on the rebuild! new bearing felts, making a new bull pin, and the slightly fiddly task of assembling it all by myself without damaging anything, or scratching the bearings! It actually turned out easier than I thought once I got it all fitted up on the bench, then on to the bed, a couple of hours, and a revelation later I got the cams adjusted, and it all went together a treat!
Phil, Back to summer in East Yorkshire!
Posts: 332
Threads: 10
Joined: Nov 2012
Location: East Yorkshire
The following 2 users Like hermetic's post:
EdK (10-01-2022), Vinny (10-01-2022)
10-01-2022, 10:16 AM
A good week with a lot of progress, the headstock bearings get adjuster correctly after some sage advice from the Holbrook Sage! Various broken bits get fixed, and various bodges are exposed! I remove the old pin from the back gear shaft, repair it and drill and fit a new one, I strip and clean the top slide and the cross slide, and eventually repair the missing pin from the topslide nut plus lots of other bits cleaned and fitted
Phil, A fair week and a Friday storm in East Yorkshire!
Posts: 332
Threads: 10
Joined: Nov 2012
Location: East Yorkshire
The following 1 user Likes hermetic's post:
Vinny (10-09-2022)
Another good week of fettling and eliminating some of the bad repairs and abuses this machine has suffered over the years. I spend much time degreasing the saddle to get the Belzona to stick, and hope I suceeded! I repair the broken Gear cover casting with MIG which is far from impossible, and sus out a scheme of repairing the rest!
Phil, in Cool and wet autumnal East Yorkshire.
Posts: 332
Threads: 10
Joined: Nov 2012
Location: East Yorkshire
The following 1 user Likes hermetic's post:
Vinny (10-18-2022)
10-15-2022, 10:10 AM
(This post was last modified: 10-15-2022, 10:26 AM by hermetic.)
A very trying week being Mr Pedantic and trying to get the gear cover repair EXACTLY right which tried my patience to the point where I took a midweek break and started work on building a waste oil burning insert for the wood stove! That will be continued, and I hope completed, next week. It is (or at least was) getting colder, and as I have about 75 litres of waste oil from the tractor rebuild and a regular source of expired chip oil, it would save a lot of woodcutting. I get back on the Holbrook on Friday, and it turns out really well! Sometimes it pays to take a break!
Phil, an indian summer in East Yorkshire
Posts: 332
Threads: 10
Joined: Nov 2012
Location: East Yorkshire
The following 3 users Like hermetic's post:
Vinny (10-29-2022), EdK (10-29-2022), f350ca (10-30-2022)
To continue from last weeks blurb, sometimes being pedantic pays off! I get the shaper and the mill fully back into commission, make a new vice jaw to replace the missing one on the shaper vice mill the weld off the new section for the gear cover, it falls apart and I settle on a new strategy fot order of assembly! With milling and shaping, tidying up and 3 foot long dreadlocks, its all in my week this week!
Phil, In exceedingly wet East Yorkshire
Posts: 2,629
Threads: 101
Joined: Dec 2014
Location: Michigan
Posts: 332
Threads: 10
Joined: Nov 2012
Location: East Yorkshire
The following 2 users Like hermetic's post:
EdK (12-15-2022), Vinny (12-15-2022)
12-15-2022, 08:30 AM
(This post was last modified: 12-15-2022, 08:35 AM by hermetic.)
Hi all, I get back to the workshop on the Thursday of this week, was going to do friday as well, but circumstances overtook me and I never got there. As winter approaches fast I decided to crack on with the heating, and find the fan which is most suitable has knackered bearings, more on order as we speak. I have other fans I could use, but they are predomantly plastic, and although they would work, not really suitable for a burner! I also have a few gas boiler flue fans, but all have a 2" outlet! I will prevail! I will try to get back Monday and see how it goes, the fishermans freinds are a usefull anti cough!
Phil
Posts: 332
Threads: 10
Joined: Nov 2012
Location: East Yorkshire
The following 1 user Likes hermetic's post:
Vinny (12-15-2022)
There are also THREE others that I forgot to add to forums, please go to
https://www.youtube.com/@philhermetic/videos
to watch them!
Thanking you all for your continued support as I recover from the dread virus!!
Phil
|