Prep For Machining Cast Iron
#6
(12-29-2023, 12:08 PM)rleete Wrote: Do we get a hint as to what you are making?

A block to mount the QCTP on to eliminate the compound. I made one previously but for some really stupid reason I did not make it to the same height as the compound which requires me to adjust the tool holders in the QCTP when I switch between the block and the compound. A royal pain in the butt because of my stupidity!

I machined two sides of the block and found there ware ridges on the surfaces that pointed to an out of tram mill head so I de-condomized the mill and measured the tram. I was expecting the Y tram to be out based on the ridges but it was spot on and the X tram was within .00025" so out of tram was eliminated. Next I measured for jaw lift on the movable jaw of the vise but there was none at all. Perplexing to say the least.

So now I'm trying a fly cutter to see if I get better results. To be continued.  Bash

Ed
Reply
Thanks given by:


Messages In This Thread
Prep For Machining Cast Iron - by EdK - 12-28-2023, 03:00 PM
RE: Prep For Machining Cast Iron - by rleete - 12-28-2023, 03:28 PM
RE: Prep For Machining Cast Iron - by EdK - 12-28-2023, 03:39 PM
RE: Prep For Machining Cast Iron - by Hawkeye - 12-28-2023, 10:50 PM
RE: Prep For Machining Cast Iron - by rleete - 12-29-2023, 12:08 PM
RE: Prep For Machining Cast Iron - by EdK - 12-30-2023, 12:19 AM
RE: Prep For Machining Cast Iron - by rleete - 12-30-2023, 03:19 PM
RE: Prep For Machining Cast Iron - by EdK - 12-30-2023, 04:14 PM
RE: Prep For Machining Cast Iron - by rleete - 12-30-2023, 05:10 PM



Users browsing this thread: 9 Guest(s)