10-30-2019, 09:13 AM
Hi All
The forward bulkhead is nearly done it holds the inner crankshaft bearing and the annular inlet manifold.
This now leaves only the nose piece that holds the outer crank bearing to do, then the main casing is done, apart from fixing holes and O ring
grooves ETC.
Brian.
The forward bulkhead is nearly done it holds the inner crankshaft bearing and the annular inlet manifold.
This now leaves only the nose piece that holds the outer crank bearing to do, then the main casing is done, apart from fixing holes and O ring
grooves ETC.
Brian.
Brian, proud to be a member of MetalworkingFun since Sep 2012.
http://briansworkshop.weebly.com
http://briansworkshop.weebly.com