06-24-2017, 01:47 PM
It's especially annoying because there is 3-phase on the pole right in front of my house. But I can't have two panels. I think they would do it if I replace the main panel, or if the shop was a separate building. (Seattle)
Mike
SB 10K (1976) Rockwell vertical mill (1967) Rockwell 17" drill press (1946) Me (1949)
SB 10K (1976) Rockwell vertical mill (1967) Rockwell 17" drill press (1946) Me (1949)