06-04-2017, 11:49 AM
Since my last post, I've been busy with the Rockwell milling machine. I changed out a bad bearing in the transmission (Graingers replaced no questions asked), I installed a different drive sheave/pulley, installed 2 new LED lights and raised the mill up 4".
1 - the mill in place
2 - the 4" x 4" x 1/4" box tubing, to raise up the mill
3 - the lights, bracket attached to the "transmission"
4 - bottom of the quill is now 57" off the floor
1 - the mill in place
2 - the 4" x 4" x 1/4" box tubing, to raise up the mill
3 - the lights, bracket attached to the "transmission"
4 - bottom of the quill is now 57" off the floor
jack