05-14-2017, 05:09 PM
(This post was last modified: 05-14-2017, 05:11 PM by the penguin.)
The temporary motor bracket, the Mark 1, it just slides onto the ram post, held in position by (2) 8mm x 20mm full dogpoint set screws, that set into the keyway groove, for the tramming drive collar. I'm working on other design concepts. Not really sure which way to go. I like the concept of the increased number of speeds, the correct motor drive sheave/pulley, will be here, by Thursday. I wanted to get the mill powered, to check out the head assembly, sounds great.
5 - new handles
6 - all folded up
7 - temporary motor bracket
8 - the controls
5 - new handles
6 - all folded up
7 - temporary motor bracket
8 - the controls
jack