05-14-2017, 04:53 PM
(This post was last modified: 05-14-2017, 04:55 PM by the penguin.)
I finished up the table handles today, after making the 3 handle adapters. I then did some more mill clean up, then started the shop clean up. I had used almost all the machines in the shop and had swarf from one end to the other.
While I was at it, I did some serious rooting and ended up throwing away 3 huge bags of stuff. Somehow the shop looks cleaner, but with the stuff thrown away, I expected to see some more room in the MAchinery Closet, but to no avail.
I getting ready for a week of work in Vermont, installing a burner on a boiler in a dorm at a college in Northern Vermont. A tiny burner, but the job start to finish is 5 days. With two new minions, this could be a struggle.
1 - the mill
2 - new handles
3 - vise
4 - vise and the ER32 x R8 collet chuck
While I was at it, I did some serious rooting and ended up throwing away 3 huge bags of stuff. Somehow the shop looks cleaner, but with the stuff thrown away, I expected to see some more room in the MAchinery Closet, but to no avail.
I getting ready for a week of work in Vermont, installing a burner on a boiler in a dorm at a college in Northern Vermont. A tiny burner, but the job start to finish is 5 days. With two new minions, this could be a struggle.
1 - the mill
2 - new handles
3 - vise
4 - vise and the ER32 x R8 collet chuck
jack