02-27-2017, 05:43 PM
hi all bin bizz with the mill this weekend the two brackets on the top table had to much play in them sos no pic of this bit but on the first bracket on the back side the hole was 11.5mm and at the front 10.5mm so had a rut and fawned sum 12.7mm O.D with a internal of 9.5 oil light bushes just the job as the shaft is 10mm so reemd out the bracket with a 12.7 mm reamer then with sum Bering fit put them in but left a oil gap between them then once the stuff had gone off reemd out to 10mm then lost the key one the end of the shaft mad a new one then fawned the old one :doh: any way all fitted up nice next make two oil ports only got on dun will do the other one tomorrow just need to fit the spring and drill the bracket right pics
krv3000, proud to be a member of MetalworkingFun Forum since Feb 2012.