11-09-2016, 04:34 PM
Evening Lads
Well made a wee bit more progress with my large shelf tonight ,I was pushed on by the arrival today of my second order of plastic storage tubs . (I needed somewhere to put them )
First section I did the other day , this replaces an older shelf I had up across the door ,this one is higher . The door will be replaced in the spring with something more to my needs ,I really dislike up and over doors .
So I welded up the right hand section tonight ,I had to use an old oil filed welded to do the welding as I could not get to the MIG ,way to much crap in the way
May tackle the left hand leg tomorrow night , well if its not raining .
Rob
Well made a wee bit more progress with my large shelf tonight ,I was pushed on by the arrival today of my second order of plastic storage tubs . (I needed somewhere to put them )
First section I did the other day , this replaces an older shelf I had up across the door ,this one is higher . The door will be replaced in the spring with something more to my needs ,I really dislike up and over doors .
So I welded up the right hand section tonight ,I had to use an old oil filed welded to do the welding as I could not get to the MIG ,way to much crap in the way
May tackle the left hand leg tomorrow night , well if its not raining .
Rob