(10-26-2016, 07:20 PM)Old Minger Wrote: Now I'm waiting for some parts for the lube system so next job will be to bolt it to the floor. Should I wait until the table is on before I level it up?
The short answer is yes. BTW, I recommend installing some leveling jack screws in the holes in the base. If you did so now, it would be a whole lot easier. You should also re-level after you have assembled all the big stuff. Head, ram, etc.
If you look closely at the corners of the base that's what I did on my Fray.