06-01-2016, 09:37 AM
As the sun starts to shine, workshop time goes down. But I still manage to get a little done.
The side access cover location has been milled, the bearings and camshafts fitted.
The next job will be all the fiddly holes for the screws, then the fancy work, fins and bevels, and the cut out under the side cover so I can get to the screws that help fix the drive pulley
.
Brian.
The side access cover location has been milled, the bearings and camshafts fitted.
The next job will be all the fiddly holes for the screws, then the fancy work, fins and bevels, and the cut out under the side cover so I can get to the screws that help fix the drive pulley
.
Brian.
Brian, proud to be a member of MetalworkingFun since Sep 2012.
http://briansworkshop.weebly.com
http://briansworkshop.weebly.com