02-25-2016, 06:59 AM
Cutting the cams.
Ready for finishing to size for the bearings.
Waiting for the screws.
When the screws arrive I will be able to cut the valves to length and set the valve lash.
Brian.
Ready for finishing to size for the bearings.
Waiting for the screws.
When the screws arrive I will be able to cut the valves to length and set the valve lash.
Brian.
Brian, proud to be a member of MetalworkingFun since Sep 2012.
http://briansworkshop.weebly.com
http://briansworkshop.weebly.com