11-14-2015, 04:18 PM
Not much to show but got the 50 feet of 10 gauge wire strung from the mill area to the sub panel. Also removed the 20A breaker and installed the 30A breaker and got the 10 gauge wire hooked up to it. In the process, I had to remove the wiring for the lathe from the sub panel so now I have no power to any of my machinery.
Ed
Ed