05-17-2015, 12:40 AM
Thanks Pete - yes, the size and the fact it is 3 phase worked in my favour. Apparently he had several people look at it, and all said they needed to go and measure their sheds. None called him back.
I will get it picked up with a truck with a hiab. Once it is on the ground outside my workshop, it will either be skates (if I can borrow some) or several lengths of pipe and go at it like the Egyptian's when building the pyramids. That is how both my current lathe and my mill were moved. It actually is pretty straight forward. Tight turns are a little more difficult.
I'm hoping to get it delivered next weekend. If you jump in your car now you can give me a hand to get it installed
I will get it picked up with a truck with a hiab. Once it is on the ground outside my workshop, it will either be skates (if I can borrow some) or several lengths of pipe and go at it like the Egyptian's when building the pyramids. That is how both my current lathe and my mill were moved. It actually is pretty straight forward. Tight turns are a little more difficult.
I'm hoping to get it delivered next weekend. If you jump in your car now you can give me a hand to get it installed
Hunting American dentists since 2015.