01-28-2015, 03:03 PM
Next job was to fit the cam sub assy and the oilers, this means the gears have to fit properly so it was a slowly slowly job.
Fitting the screws to locate the gear.
Seting up the gears.
Fitting oilers.
I also made a start on the carb. after spending hrs on the CAD trying to figure it out.
The diaphragm and valve have been ordered for the on demand regulator. so things are quite busy at the moment.
Brian
Fitting the screws to locate the gear.
Seting up the gears.
Fitting oilers.
I also made a start on the carb. after spending hrs on the CAD trying to figure it out.
The diaphragm and valve have been ordered for the on demand regulator. so things are quite busy at the moment.
Brian
Brian, proud to be a member of MetalworkingFun since Sep 2012.
http://briansworkshop.weebly.com
http://briansworkshop.weebly.com