01-05-2015, 02:37 PM
Hi All
Back from windy Scotland to a freezing cold Sicily, now that just ain't right.
however I returned with two 1/2 X 20 nuts for the flywheels so it's time to threads the crank ends.
Then cut the keyways for the flywheels
P1012996.JPG (Size: 49.89 KB / Downloads: 86)
Not long until we have to assemble the crank
Brian
Back from windy Scotland to a freezing cold Sicily, now that just ain't right.
however I returned with two 1/2 X 20 nuts for the flywheels so it's time to threads the crank ends.
Then cut the keyways for the flywheels
P1012996.JPG (Size: 49.89 KB / Downloads: 86)
Not long until we have to assemble the crank
Brian
Brian, proud to be a member of MetalworkingFun since Sep 2012.
http://briansworkshop.weebly.com
http://briansworkshop.weebly.com