08-16-2014, 07:24 AM
Wow - I cannot believe that there have been no posts in this thread for a week
Today I finished wiring in the three phase outlets (two isolators and one socket) and a single phase dual gang GPO. I also wired in a dedicated circuit for the A/C unit, as well as finally getting around to wiring up a second light switch for the other door (other end of the shop). Now the lights can be turned on/off via either switch.
Some pics:
The isolator in the foreground is for the lathe (the knee for the mill [sitting on the pallet] is about where the end of the lathe will sit). The one in the back corner is for the mill.
The three phase outlet on the back wall is for various items that may need three phase power, like my welders. The single phase outlet is for the pedestal drill, which will sit about there.
Looking back at a more respectable bench.
The mill will move into this corner once I paint the particle board. The cupboard is on wheels and will move where needed.
The panel (which I still need to label). The RCD (I think you call it a GFI in the US) in the separate box on the right is for the three phase outlets I just installed.
Today I finished wiring in the three phase outlets (two isolators and one socket) and a single phase dual gang GPO. I also wired in a dedicated circuit for the A/C unit, as well as finally getting around to wiring up a second light switch for the other door (other end of the shop). Now the lights can be turned on/off via either switch.
Some pics:
The isolator in the foreground is for the lathe (the knee for the mill [sitting on the pallet] is about where the end of the lathe will sit). The one in the back corner is for the mill.
The three phase outlet on the back wall is for various items that may need three phase power, like my welders. The single phase outlet is for the pedestal drill, which will sit about there.
Looking back at a more respectable bench.
The mill will move into this corner once I paint the particle board. The cupboard is on wheels and will move where needed.
The panel (which I still need to label). The RCD (I think you call it a GFI in the US) in the separate box on the right is for the three phase outlets I just installed.