Genie Mix-N-Match - Sometimes we get lucky
#10
OK so next phase is done.

Added outriggers for side stabilization. They slide into the tube socket of the frame and pin with the same pin that locks in the front Legs. I still have to make longer pins as the current ones do not reach all the way through the legs.

   
Outrigger in "in" position

   
Outrigger in "out" position

   
Outrigger stored

   
Both outriggers stored back view

   
Both outriggers stored front view.

Also ordered the bearing assembly for the jib crane attachment.

Walter
starlight_tools, proud to be a member of Metalworking Forum since Apr 2012.
Reply
Thanks given by:


Messages In This Thread
RE: Genie Mix-N-Match - Sometimes we get lucky - by starlight_tools - 06-22-2014, 06:52 PM



Users browsing this thread: 2 Guest(s)