10-06-2013, 08:18 PM
Thanks guys for the input, I have a 5hp 80 gal tank, iron pipe lines that end about 5 feet from where it goes into the machine shop area. Why it hasn't been finished is my metal stock pile is there on the floor, haven't made a stock rack yet. Started on a threaded rod storage rack, using the di-arco turret punch my shoulders kept me awake a few days, if I don't sleep well I'm dragging the next day. I've held a replacement joint in my hands and got into a argument with the doc, she didn't know why there was ridges in the ball part, she could not see them I could and feel them! Either they needed a cnc programmer to make more touches or their Holridge radii cutter was a little loose causing it to vibrate. It has been recalled any way, my concern is how it is attached to the bone that is a major failure point! Seems like a never ending cycle of projects but I would not have it any other way. My boy is in college or he would be here to help a little if I can get him away from the video games.
oldgoaly, proud to be a member of MetalworkingFun Forum since Jun 2013.