06-28-2013, 05:58 PM
The slotter is fitted , well located would be a more apt term as its not wired up yet and the mill is now stuck in limbo until its moved forward as the head wont clear the wall or cupboard now , I knew this would be the case and am planning on making a castored base with jacking points so the mill can be moved if need be, it will be worth doing just to be able to get to the rear of the machine for repairs etc............. so another project lol , as well as fitting two new inverters and the DRO, watch this space but dont hold your breath !
This is the slotter bolted on , swivels and locks up spot on.
The ram is still far too stiff to move with the bracket but will wait till the mill is moved before trying again anyway now.
Cheers Mick
This is the slotter bolted on , swivels and locks up spot on.
The ram is still far too stiff to move with the bracket but will wait till the mill is moved before trying again anyway now.
Cheers Mick
Micktoon, proud to be a member of MetalworkingFun since Sep 2012.