05-29-2013, 01:30 PM
Next job is to get the motion work set up, first the gears are put on the depthing tool, to get them running at the same centres, this measurement will be transferd to the front plate, to place the min wheel stud.
The --minute wheel pipe -- hour wheel pipe --and hour wheel collet all run co axial on the stud.
When this is done its on to the dial.
The --minute wheel pipe -- hour wheel pipe --and hour wheel collet all run co axial on the stud.
When this is done its on to the dial.
Brian, proud to be a member of MetalworkingFun since Sep 2012.
http://briansworkshop.weebly.com
http://briansworkshop.weebly.com