The connecting rod was milled from 1" steel plate.
Then built up with the fly wheels using a temporary crank pin until we balanced it.
Brian.
Then built up with the fly wheels using a temporary crank pin until we balanced it.
Brian.
Brian, proud to be a member of MetalworkingFun since Sep 2012.
http://briansworkshop.weebly.com
http://briansworkshop.weebly.com