04-27-2013, 03:32 AM
Thanks guys, it's good to get a bit of feed back on projects.
I was totally over making it by the time it was finished as it ended up a bigger job than I thought. The black sealer was the worse and just putting the main tray together after all the holes where drilled with the sealer took around 5 hours as the stuff ended up everywhere I looked and needed turps to get it off. It was on my hands for days as it stained, LOL
Mick,
When ever I make anything I try to aim for it to look factory. In the past I have shown mates things I have made and they haven't believed me, then I go and get some off cuts or something from in the shed that it was cut out of to convince them I made it.
Dave
I was totally over making it by the time it was finished as it ended up a bigger job than I thought. The black sealer was the worse and just putting the main tray together after all the holes where drilled with the sealer took around 5 hours as the stuff ended up everywhere I looked and needed turps to get it off. It was on my hands for days as it stained, LOL
Mick,
When ever I make anything I try to aim for it to look factory. In the past I have shown mates things I have made and they haven't believed me, then I go and get some off cuts or something from in the shed that it was cut out of to convince them I made it.
Dave