a big D.T.I refit
#3
once a part their was two things that needed downing one repairing the plunger rod two reaper the base cover i reaped the plunger rob by cutting the end off and drilling 1.6mm by 6 deep then taping with a m2 tap i then made a new bottom length of rod and drilled both ends 1.6mm by 6 deep then taped them m2 then with sum Bering fit and a length of m2 studding i jond the two together as for the back i just cleaned up the part that sum one had made before and silver soldered it to the back right pics


Attached Files Thumbnail(s)
                                   
krv3000, proud to be a member of MetalworkingFun Forum since Feb 2012.
Reply
Thanks given by:


Messages In This Thread
a big D.T.I refit - by krv3000 - 04-07-2013, 05:40 PM
RE: a big D.T.I refit - by krv3000 - 04-07-2013, 05:48 PM
RE: a big D.T.I refit - by krv3000 - 04-07-2013, 06:11 PM
RE: a big D.T.I refit - by Mayhem - 04-07-2013, 06:30 PM
RE: a big D.T.I refit - by EdK - 04-07-2013, 06:58 PM
RE: a big D.T.I refit - by stevec - 04-08-2013, 06:37 AM
RE: a big D.T.I refit - by Mayhem - 04-08-2013, 06:55 AM
RE: a big D.T.I refit - by stevec - 04-08-2013, 02:58 PM
RE: a big D.T.I refit - by Micktoon - 04-08-2013, 03:04 PM
RE: a big D.T.I refit - by DaveH - 04-08-2013, 03:20 PM
RE: a big D.T.I refit - by doubleboost - 04-08-2013, 03:32 PM
RE: a big D.T.I refit - by stevec - 04-08-2013, 03:37 PM
RE: a big D.T.I refit - by krv3000 - 04-09-2013, 06:40 PM
RE: a big D.T.I refit - by EdK - 04-10-2013, 05:41 AM
RE: a big D.T.I refit - by sasquatch - 04-10-2013, 07:12 AM



Users browsing this thread: 1 Guest(s)