09-22-2017, 04:05 AM
Hi all the holidays are over so it-s back to the shop.
The next job was to cut the shafts to length and fit the retaining screws.
Then the pulleys had to be pined to the shafts to do this I used a 1mm drill and a 1mm end mill , the pin was cut from a length of pivot steel.
Drill the shaft
Mill the slot
Fit the pin
And assemble
The gears can now be fitted in the case.
Slowly slowly Brian.
The next job was to cut the shafts to length and fit the retaining screws.
Then the pulleys had to be pined to the shafts to do this I used a 1mm drill and a 1mm end mill , the pin was cut from a length of pivot steel.
Drill the shaft
Mill the slot
Fit the pin
And assemble
The gears can now be fitted in the case.
Slowly slowly Brian.
Brian, proud to be a member of MetalworkingFun since Sep 2012.
http://briansworkshop.weebly.com
http://briansworkshop.weebly.com