Todays Project - What did you do today? - Printable Version +- MetalworkingFun Forum (http://www.metalworkingfun.com) +-- Forum: Machining (http://www.metalworkingfun.com/forum-5.html) +--- Forum: Projects (http://www.metalworkingfun.com/forum-7.html) +--- Thread: Todays Project - What did you do today? (/thread-727.html) Pages:
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
492
493
494
495
496
497
498
499
500
501
502
503
504
505
506
507
508
509
510
511
512
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528
529
530
531
532
533
534
535
536
537
538
539
540
541
542
543
544
545
546
547
548
549
550
551
552
|
RE: Todays Project - What did you do today? - zmotorsports - 06-12-2015 I don't know what the postal delivery person did the other day but I came home to find my mailbox door was damaged. By the looks of it, they got a little close with their Jeep and maybe caught a mirror or something on it. The mailbox door is pretty thin sheet metal so it wouldn't take much. I made a template of the opening to start with, then the side profile including the riveted hinge arrangement. After cutting the main portion and the side profile pieces out of some 14 gauge P&O I clamped them to an aluminum block on the welding bench. More clamps because I wanted to perform an autogenious weld (without filler) so I could blend the area easier. Welds completed. Small TIG tacks around the radius. I try to keep them as small as possible so when welding I can merely go right over them and not have a large bump where the tack was. Welding completed and the edge was radius and blended. Next was the lathe to create a couple of small spacers to act as a hinge. I drilled out the door to .375" for the spacer to slip into. I then machined an aluminum rod to the inside dimension of the underside of the mailbox (6.200") and drilled tapped each side to accept a 1/4-20 threaded screw. Mocked up with hinge, spacer and screw in place. I then bead blasted the cover/door, primed it with a metal etching primer (rattle can) and painted it with some Rustoleum extreme weather Gloss White paint. Actual "extreme weather" is yet to be determined. Completed and installed along with the brushed stainless steel knob. After the paint dried and I installed it I had the wife give it her approval. Another job she approves of.:thumbup: Mike. RE: Todays Project - What did you do today? - EdK - 06-12-2015 Nice welding job Mike. Ed RE: Todays Project - What did you do today? - DaveH - 06-12-2015 Very nice Mike, I like your attention to detail and the care you take. Good craftsmanship DaveH RE: Todays Project - What did you do today? - aRM - 06-12-2015 Hello there Mike I like the way U illustrated each of the progressive steps and finished off very neat and professional like, maybe lots better than the original. As long as the Boss is satisfied, U will be happy !!! Well done and keep 'em rolling aRM RE: Todays Project - What did you do today? - zmotorsports - 06-12-2015 (06-12-2015, 12:12 PM)EdK Wrote: Nice welding job Mike. Thanks Ed. (06-12-2015, 12:35 PM)DaveH Wrote: Very nice Mike, I like your attention to detail and the care you take. Good craftsmanship Thanks Dave. I appreciate the compliment. (06-12-2015, 01:24 PM)aRM Wrote: Hello there Mike Thank you. I agree, keep the Boss happy. Mike. RE: Todays Project - What did you do today? - zmotorsports - 06-12-2015 Thought I would throw up some pictures of a set of windshield mounting brackets for a friends HD that I machined last week. I made the bore and squared up some stock a couple weeks ago. Now I just had to turn the radius and complete them. Started by making a mandrel to mount the blocks on my rotary table. Boring to fit over the morse taper/mandrel. Test fit before removing from lathe. Now test fit into the rotary table. Set up on the rotary table. Dialing in on center. That little modified NOGA test indicator holder sure comes in handy. Plunging away around the radius. I made a climb milling finishing cut. I then flattened off the ends where the fastener will be. One down, one to go. Setting up the second one on the rotary table. Ready for the next step of removing the center portion. Center portion removed and deburred. I didn't have any .625" stainless steel rod so I had to improvise and use some stainless steel bolts. Getting closer. Set up in the collet block to drill the .380" hole through the head. Completed and ready to be picked up by the owner. All in all a pretty straightforward and fun little job. Mike. RE: Todays Project - What did you do today? - zmotorsports - 06-12-2015 I know I am new here and I don't want to hop up the whole thread but here is a project on my Jeep that I did about a month ago. I need to fabricate some new suspension links/control arms for my Jeep. I have a BDS long-arm suspension system on it but the bushings they used are proprietary and I have had to replace them twice, this will be the third time, in less than 50k miles. Not acceptable so I am building new links to accept the OEM style Clevite rubber incapsulated bushings at the axle and then I am going to use Currie's Johnny Joints at the frame connection. These are proven to be a much more durable setup. I started by cutting some thick walled mild steel tubing to size with the horizontal bandsaw before chucking it up in the lathe. Boring the I.D. to size. This will also have a .039" step machined into it as the bushing itself has a two step ridge. I have calculated for a .002" interference fit at both ridges. Now that the inside bore is to size I will turn the O.D. down to 2.750" giving me a little over .200" wall thickness. Two down and two to go. All four are completed. Next up is to get the uppers machined and then I am ready to measure out some tubing and get to fabricating the new links. Mike. RE: Todays Project - What did you do today? - zmotorsports - 06-12-2015 Last of the link ends machined. These are a bit smaller and will reside at the upper rear axle location with similar Clevite style bushings. Sleeves completed. All six sleeves completed and ready to start measuring, cutting and fabricating new suspension links/control arms. Mike. RE: Todays Project - What did you do today? - zmotorsports - 06-12-2015 Last of the Jeep long-arm suspension build. I put the Jeep on the lift and removed all front upper and lower control arms/links for duplication with Clevite bushings at the axle ends and Currie's Johnny Joints at the frame ends. The Clevite rubber incapsulated bushings will be installed into the sleeves that I machined earlier in the week, shown above. Here is my lower link. I threw together a quick make-shift fixture to ensure setting the new links to the exact same length. I just used a piece of .750" square tubing with a .500" shaft welded at each end which the link slipped onto. I then mocked up my new sleeve/Clevite bushing and Johnny Joint to calculate the length of the new tubing. It was at this point the light bulb came on. I had new 1.750"x.250" DOM that I was going to use but where I was going to be using less length than what the original BDS links measured, why not just cut the ends off the BDS links and weld my sleeves and threaded bungs to. This would save me from wasting tubing plus eleviate me from having to bend up the links which would actually save some time. That is what I did, cut the BDS bushing ends off and re-used the DOM tubing. Link clamped in my mill to drill a hold all the way through the tubing for rosette/plug welds for the threaded bung/sleeve. Mocked up on the fixture for a test fit, to ensure I cut enough tube to allow for some adjustment. Threaded bung welded into tubing. Few pictures of the front lower two links ready for prep and paint. I opted to TIG weld the uppers due to the close thinner wall tubing of the Currie weld-on narrow JJ ends. All front links sanded, prepped and ready for paint. After allowing the POR-15 to dry overnight I then pressed the Clevite bushings into the machined sleeves on the lower links. I then applied some anti-seize into the threaded bung as well as on the threads of the Johnny Joint and assembled then placed on my fixture to set to the correct length. Front upper and lower links assembled and ready for installation back into the Jeep. Before installation I noticed that on the front lowers the OEM are actually adjustable a small amount buy using an eccentric. This required the through holes to be slightly over-sized for the 14mm bolts. Although the bolts will be tightened and thus eliminating the slop I wanted a little more surface area on the shank of the bolt to eliminate any fore and aft movement once installed. This will give extra support so it is not merely relying on the friction of the clamping force of the fastener. I machined four spacers that were 14mm inside diameter for the bolt and 1.5" OD by .125" thick. I then placed them onto the lower mounts using the bolts to hold in place while I stitch welded a couple of welds to secure them to the lower mounts. Front suspension installed. I tightened the frame ends (Johnny Joints) but left the axle ends loose. You do NOT want to tighten the incapsulated rubber style bushings unless you have the vehicle sitting down at ride height, otherwise you will preload stress into the bushings and cause pre-mature wear/failure. I actually set the vehicle down with the nuts threaded on hand tight, drive the vehicle around the block bouncing it to let the suspension "settle in", then pull it back into the shop and tighten the axle ends. Pictures of the rear following. Mike. RE: Todays Project - What did you do today? - zmotorsports - 06-12-2015 Moving onto the rear links/control arms. I clamped the rear upper links into the mill vise and used a large end mill to cope/fishmouth the link to accept the newly machined bushing sleeve. I then chamfered the end to allow good penetration as the upper links are solid and not tubing. The adjustable end for the upper is threaded tube so I coped/fishmouthed it the same way to accept the Currie Johhny Joint weld-on narrow joint. Rear upper adjustable ends TIG welded and ready for paint. Few pictures of the lower links all welded and ready for sanding and paint. All of the old BDS link ends cut off and the pile of remnants. While the Jeep was on the lift I decided to scuff the frame rails down and freshen up the paint on the frame to match the newly fabricated and painted suspension links. And lastly after taking it for a spin around the block, I pulled it back into the shop to torque the axle end down. After tightening the axle ends and double checking all other fasteners I took it for its test drive. Now that all the play or slop is gone in the suspension it feels like a completely different Jeep. I hated pulling up to stop signs because I could feel the clearance and then again at take-off. Now nothing.:rocker: I even hit reverse and forward while power braking (well as much power as a Jeep has:bounce:) and no slop at all in the suspension. I hope to get many trouble free miles from this setup unlike the past 40k+ miles and several bushing replacements. Mike. |