MetalworkingFun Forum
Looking for input/help on the Pro Tram System from Edge Technologies - Printable Version

+- MetalworkingFun Forum (http://www.metalworkingfun.com)
+-- Forum: Machining (http://www.metalworkingfun.com/forum-5.html)
+--- Forum: Metrology (http://www.metalworkingfun.com/forum-33.html)
+--- Thread: Looking for input/help on the Pro Tram System from Edge Technologies (/thread-1915.html)

Pages: 1 2


RE: Looking for input/help on the Pro Tram System from Edge Technologies - awemawson - 12-22-2013

They both face the same way as that is the way the tool is used - facing you!

Only while zeroing the gauges to the magnet (that remains stuck at one spot on the table) is the tool swung to get gauge #2 over the same position that gauge #1 was zereod. From then on you bring both gauges onto the table, and adjust the head tramming until they read the same.

Andrew


RE: Looking for input/help on the Pro Tram System from Edge Technologies - DaveH - 12-22-2013

Personally I wouldn't change the indicators, the ones you have Ron are .0005" divisions with a repeatability of .0002". I think they are good enough. Thumbsup
Smiley-eatdrink004
DaveH


RE: Looking for input/help on the Pro Tram System from Edge Technologies - ScrapMetal - 12-22-2013

(12-22-2013, 11:57 AM)DaveH Wrote: Personally I wouldn't change the indicators, the ones you have Ron are .0005" divisions with a repeatability of .0002". I think they are good enough. Thumbsup
Smiley-eatdrink004
DaveH

In theory, you are right. So far though, I'm not confident that they will live up to the advertised tolerances. I will work with them a bit more but it's going to take a fair bit of "proof" to get my confidence back with them.

Thanks,

-Ron